Bathroom Remodel Update

Things are progressing well and I think we’re still on target. Toilet was re-installed last night (Thank GOD), rest of the tiles on the wall were done this morning and Evan is now grouting. Once that’s done, a little bit of painting, drilling and hanging.

One thought on “Bathroom Remodel Update

  1. John Price says:

    I just finished the same job myself. Took the room down to the studs and sub-floor, and replaced a lot of sub-floor. New tub, new toilet, 4×4 tiles floor to ceiling. 12×12 tiles on floor. Grouting was the drudgery part. I used two part epoxy grout, which was very expensive and hard to work with, but made some very waterproof joints. Don’t know if I’d use it again or not.